WARNING! Off-site contact information posted. We do not investigate disputes if you communicate off-site.
Clean Global High End Game, bind with Email.
Used to be Top Rank in G1 Server. (the first server when mobile version comes)
Story is at latest chapter,
Not clean all the story yet.
Current AFK Stage at 2045+.
Current total power is at 110B, with Base Power 44.850K+
will rank on top 100+ in every content if participate properly.
G1 Server is pretty brutal since there is so many first player whale, so expect challenge.
Have most hero. minus 6 left.
can Paragon some hero if put the resources correctly.
Can pull many hero, and surely supreme+ the new hero and Cele/Hypo since there is many diamond and stargaze ticket.
Able to pity current event pull for Natsu and Shemira with Season S level swap and diamond.
110k+ Diamond, 52+ Stellar Crystal, and many more invite ticket, hundreds resources essence to max exclusive equipment, and hundreds more to max affinity hero. No need to think about resources anymore, just play.
Have 72 heros (4 Paragon, 20 supreme +, the rest around mythic and lgendary+)
PARAGON
- Lily May (max eq)
- Sonja
- Brutus
- Oddie
SUPREME + (just note)
- Phraesto (4* eq)
- Bonnie
- Tasi (max eq)
- Mikola
- Ludovic
- * And 15 more (on image bellow)
Reiner, Twins, still in mythic+ and Mythic. can supreme+ it yourself with current resources.
The price is $100. PayPal FF only.
If you want More Information about Specific Hero, build, resource, etc, feel free to ask
Discord: adentanuki
[image for detail below]
*I will always update the information, therefore sometimes the image doesn't match the description
Used to be Top Rank in G1 Server. (the first server when mobile version comes)
Story is at latest chapter,
Not clean all the story yet.
Current AFK Stage at 2045+.
Current total power is at 110B, with Base Power 44.850K+
will rank on top 100+ in every content if participate properly.
G1 Server is pretty brutal since there is so many first player whale, so expect challenge.
Have most hero. minus 6 left.
can Paragon some hero if put the resources correctly.
Can pull many hero, and surely supreme+ the new hero and Cele/Hypo since there is many diamond and stargaze ticket.
Able to pity current event pull for Natsu and Shemira with Season S level swap and diamond.
110k+ Diamond, 52+ Stellar Crystal, and many more invite ticket, hundreds resources essence to max exclusive equipment, and hundreds more to max affinity hero. No need to think about resources anymore, just play.
Have 72 heros (4 Paragon, 20 supreme +, the rest around mythic and lgendary+)
PARAGON
- Lily May (max eq)
- Sonja
- Brutus
- Oddie
SUPREME + (just note)
- Phraesto (4* eq)
- Bonnie
- Tasi (max eq)
- Mikola
- Ludovic
- * And 15 more (on image bellow)
Reiner, Twins, still in mythic+ and Mythic. can supreme+ it yourself with current resources.
The price is $100. PayPal FF only.
If you want More Information about Specific Hero, build, resource, etc, feel free to ask
Discord: adentanuki
[image for detail below]
*I will always update the information, therefore sometimes the image doesn't match the description
Last edited:
