2 mythcial 2 epic left mikage 13m power

Not Recently Bumped
Status
Closed Thread This thread has been closed and the item is no longer available.

Semih07

(5 reviews)

Semih07

Level 38

Trade Guardian Orders: 2

(100%) (5 reviews)
Country
Turkey
Member Since
May 16, 2024
Country
Turkey
Multiple Accounts
0
Krixia , arbais 2 mythical , gnut taras 13m power. 2 epic left mikage

Pay method : crypto
- Huge PVP potential
- Has most of the champs needed for every dungeon on Hard.
-clan boss all colour 100m damage
- All DT cleared
- Hydra Normal/Hard/Brutal auto teams
- Hard Dungeons
16 sacred shard
9 primal shard
Clan boss full auto all colour
 

Attachments

  • IMG_4900.png
    IMG_4900.png
    4 MB
  • IMG_4903.png
    IMG_4903.png
    4.3 MB
  • IMG_4901.png
    IMG_4901.png
    4.2 MB
  • IMG_4905.png
    IMG_4905.png
    4.3 MB
  • IMG_4906.png
    IMG_4906.png
    4.9 MB
  • IMG_4911.png
    IMG_4911.png
    4.3 MB
  • IMG_4926.png
    IMG_4926.png
    2.7 MB
  • IMG_4927.png
    IMG_4927.png
    924.1 KB
  • IMG_4867.png
    IMG_4867.png
    3.3 MB
  • IMG_4868.png
    IMG_4868.png
    3.3 MB
  • IMG_4869.png
    IMG_4869.png
    1.6 MB
  • IMG_4866.png
    IMG_4866.png
    2 MB
  • IMG_4849.png
    IMG_4849.png
    3.2 MB
  • IMG_4850.png
    IMG_4850.png
    3.3 MB
  • IMG_4846.png
    IMG_4846.png
    2.1 MB
  • IMG_4845.png
    IMG_4845.png
    2.2 MB
  • IMG_4844.png
    IMG_4844.png
    3.8 MB
  • IMG_4843.png
    IMG_4843.png
    3.4 MB
  • IMG_4842.png
    IMG_4842.png
    2.8 MB
  • IMG_4839.png
    IMG_4839.png
    1.3 MB
  • IMG_4836.png
    IMG_4836.png
    2.5 MB
  • IMG_4837.png
    IMG_4837.png
    2.5 MB
  • IMG_4834.png
    IMG_4834.png
    3.4 MB
  • IMG_4829.png
    IMG_4829.png
    1.9 MB
  • IMG_4830.png
    IMG_4830.png
    2.1 MB
  • IMG_4831.png
    IMG_4831.png
    1.7 MB
Status
Closed Thread This thread has been closed and the item is no longer available.
Back
Top