13m power 2 mythical, gnut, taras, 2 wukong 2 epic left mikage

Not Recently Bumped
Status
Not open for further replies.

Semih07

Level 38

Trade Guardian Orders: 2

(100%) (5 reviews)
Country
Turkey
Member Since
May 16, 2024
Country
Turkey
Multiple Accounts
0
2 mitichal arbais and kirixia. 13m power. Over 100 lego
Taras + gnut 2 epic left mikage
Pay method : crypto
- Huge PVP potential
- Has most of the champs needed for every dungeon on Hard.
-clan boss all colour 100m damage
- All DT cleared
- Hydra Normal/Hard/Brutal auto teams
- Hard Dungeons
16 sacred shard
9 primal shard
Clan boss full auto all colour
 

Attachments

  • IMG_4900.png
    IMG_4900.png
    4 MB
  • IMG_4901.png
    IMG_4901.png
    4.2 MB
  • IMG_4903.png
    IMG_4903.png
    4.3 MB
  • IMG_4905.png
    IMG_4905.png
    4.3 MB
  • IMG_4906.png
    IMG_4906.png
    4.9 MB
  • IMG_4869.png
    IMG_4869.png
    1.6 MB
  • IMG_4866.png
    IMG_4866.png
    2 MB
  • IMG_4867.png
    IMG_4867.png
    3.3 MB
  • IMG_4868.png
    IMG_4868.png
    3.3 MB
  • IMG_4850.png
    IMG_4850.png
    3.3 MB
  • IMG_4849.png
    IMG_4849.png
    3.2 MB
  • IMG_4845.png
    IMG_4845.png
    2.2 MB
  • IMG_4846.png
    IMG_4846.png
    2.1 MB
  • IMG_4843.png
    IMG_4843.png
    3.4 MB
  • IMG_4842.png
    IMG_4842.png
    2.8 MB
  • IMG_4839.png
    IMG_4839.png
    1.3 MB
  • IMG_4840.png
    IMG_4840.png
    1.9 MB
  • IMG_4841.png
    IMG_4841.png
    3 MB
  • IMG_4836.png
    IMG_4836.png
    2.5 MB
  • IMG_4838.png
    IMG_4838.png
    2.6 MB
  • IMG_4837.png
    IMG_4837.png
    2.5 MB
  • IMG_4835.png
    IMG_4835.png
    3.4 MB
  • IMG_4834.png
    IMG_4834.png
    3.4 MB
  • IMG_4830.png
    IMG_4830.png
    2.1 MB
  • IMG_4831.png
    IMG_4831.png
    1.7 MB
  • IMG_4829.png
    IMG_4829.png
    1.9 MB
Last edited:
CUSTOMER REVIEWS/QUESTIONS
  • TRADE GUARDIAN TRANSACTION
Trade Guardian transaction successfully completed for $225.00
 
Status
Not open for further replies.
Back
Top